Configuration and retrofit of ship unloading systems covering grab selection, hoisting and closing mechanisms, trolley and gantry structure, operator practice and the quay interface.
Sample characteristics and technical parameters
The following is taken from HaoZhuo's bulk-handling brochure. These are sample configurations, not the full supply range. The final model, parameters and delivery scope follow the documents confirmed by both parties.
Characteristics in the brochure
- For unloading coal, ore and other bulk materials at ports and terminals, using a grab.
- Main arrangements include four-drum wire-rope haulage, main-and-auxiliary trolley haulage, and a self-propelled trolley.
- QX6-7.5/15 and QXY10-10.5/21: self-propelled trolley with a four-drum mechanism.
- QXY38-15/30, QXJ42-15/30 and QXY57-18/30: balanced main and auxiliary trolleys. Hoisting, grab opening and closing, and trolley travel are fully PLC-controlled.
Sample parameters for grab ship unloaders
Parameters shared by the models below
| Application | Bulk unloading at ports and terminals |
|---|
| Parameter | QX6-7.5/15 | QXY10-10.5/21 | QXY38-15/30 | QXJ42-15/30 | QXY57-18/30 |
|---|---|---|---|---|---|
| Rated output, t/h | 160 | 350 | 1400 | 1500 | 2000 |
| Rated lifting capacity, t | 6 | 10 | 38 | 42 | 57 |
| Lift, above rail / below rail, m | 9.2 / 9 | 13 / 14 | 25 / 25 | 26 / 20 | 26 / 20 |
| Hoisting speed, m/min | 40 | 76 | 130 | 160 | 160 |
| Trolley speed, m/min | 55 | 100 | 180 | 180 | 180 |
| Trolley travel distance, m | 20.76 | 21.2 | 315 | 290 | 280 |
| Gantry travel speed, m/min | 20 | 20 | 20 | 25/18 | 20 |
| Grab outreach, m | 15 | 21 | 30 | 30 | 30 |
| Grab capacity, m³ | 3 | 5.3 | 23.4 | 26.5 | 45 |
| Coal hopper capacity, m³ | 28 | 38 (+12) | 120 | 120 | 120 |
| Belt speed × width, m/s × mm | 1×1000 | 2×1200 | 3.5×1800 | 3.5×1800 | 3.5×2000 |
| Machine weight, kg | 146000 | 365000 | 879000 | 895000 | 1000000 |
| Total power, kW | 150 | 530 | 950 | 1050 | 1250 |
| Cabin travel speed, m/min | 20 | 20 | 25 | 25 | 25 |
Low grab fill rate cannot be fixed by fitting a larger grab
For this type of issue, equipment drawings, operating records and site conditions can inform the scope of inspection, design and retrofit. Causes, measures and responsibilities require site-specific verification.
This is a service scenario, not evidence of a completed project or acceptance result.
Short hoisting and closing rope life cannot be fixed by increasing rope diameter
For this type of issue, equipment drawings, operating records and site conditions can inform the scope of inspection, design and retrofit. Causes, measures and responsibilities require site-specific verification.
This is a service scenario, not evidence of a completed project or acceptance result.
Abnormal gantry and travel vibration should not start with structural reinforcement
For this type of issue, equipment drawings, operating records and site conditions can inform the scope of inspection, design and retrofit. Causes, measures and responsibilities require site-specific verification.