Stacker engineering services
Discuss new design, retrofits and site engineering around stacking processes, the machine and conveyor interfaces.
From complete-machine design, procurement and manufacturing to installation, retrofits, commissioning and after-sales support, choose a project stage or multidisciplinary coordination as required.

New design: define machine interfaces from the stacking process
A new stockyard needs to define material infeed, stockpile formation and links between the machine and conveying system. A site layout may already exist, while equipment selection and scope still need clarification.
How HaoZhuo participates
HaoZhuo can support complete-machine concepts and design coordination for stackers, considering mechanical structures, travel and luffing functions, hydraulics and electrical controls. Procurement, manufacturing and installation services are organised within the agreed project scope.
How the work connects
List operating conditions and external civil, conveying and power interfaces before detailed discipline design. Mechanism choices depend on the actual machine and operating conditions.
Start the discussion with
Stockyard and conveyor general arrangements, materials, target stacking capacity, yard conditions and external interfaces.
Ask Mr Liu about this scenario ↗Process changes: assess the existing machine before changing requirements
Changes to stacking location, operating methods or upstream coordination can affect movement envelopes, mechanical loads, hydraulic movements and control logic. Updating an operator screen alone may not be sufficient.
How HaoZhuo participates
HaoZhuo can compare existing and proposed operating conditions and coordinate multidisciplinary solutions, identifying retained components, required checks and changed interfaces before agreed design, procurement and retrofit work.
How the work connects
Assess changes affecting structures, movement and safety specifically. Establish feasible boundaries before defining site work and commissioning.
Start the discussion with
Existing general arrangements, original design conditions, proposed stacking changes, condition records and production restrictions.
Ask Mr Liu about this scenario ↗Installation coordination: connect delivered equipment to the production process
After components arrive, installers, suppliers and operators must align their interfaces. Inconsistent mechanical assembly, hydraulic and electrical installation conditions can affect commissioning schedules.
How HaoZhuo participates
HaoZhuo can provide agreed engineering coordination during installation, clarify drawings and interfaces, support mechanical, hydraulic and electrical readiness checks, and participate in individual and integrated commissioning and handover.
How the work connects
Define site responsibilities, inspection records and change-confirmation methods. Plan upstream conveyor integration; the scope of installation work is agreed separately.
Start the discussion with
Supply lists, installation drawings, site progress, party responsibilities and integrated commissioning plans.